Ok, here is the house we are building.
Thread Starter
Registered User


Joined: Sep 2002
Posts: 2,456
From: Ex-NY, Ex-FL, now in Elkton, MARYland.

Ok, here is the house we are building.
For those that don't know yet we are building a home here in Elkton, MD.
4 bedrooms and an office.
2 1/2 baths and then full plumbing for a 3rd in the unfinished basement, I will finish off the basement some time in the future. Basement has a walk out to the back yard.
2 car side entry garage.
1.1 acre, 1/2 of it is wooded and it backs up to conservation land that nobody will develop back there in the future.
We are at the end of a cul-de-sac, at the end, to the right side, just like back in Florida...we thought that was weird.
We broke ground a month ago and it is going fast so far due to great weather.
So here are the pictures so far. I update them weekly and new ones to the bottom of the page, there won't be many changes from the outside now that the house is there, but we will still update each week. Plumbing, electrical and everything is expected to be finished in 2 weeks and then the drywall goes up. Can't wait!
Check it out....the new Savarese home.
4 bedrooms and an office.
2 1/2 baths and then full plumbing for a 3rd in the unfinished basement, I will finish off the basement some time in the future. Basement has a walk out to the back yard.
2 car side entry garage.
1.1 acre, 1/2 of it is wooded and it backs up to conservation land that nobody will develop back there in the future.
We are at the end of a cul-de-sac, at the end, to the right side, just like back in Florida...we thought that was weird.
We broke ground a month ago and it is going fast so far due to great weather.
So here are the pictures so far. I update them weekly and new ones to the bottom of the page, there won't be many changes from the outside now that the house is there, but we will still update each week. Plumbing, electrical and everything is expected to be finished in 2 weeks and then the drywall goes up. Can't wait!
Check it out....the new Savarese home.
Thread Starter
Registered User


Joined: Sep 2002
Posts: 2,456
From: Ex-NY, Ex-FL, now in Elkton, MARYland.

Re: Ok, here is the house we are building.
Here is the builders pic from their site of what the house will look similar to.
Here is the floor plan.
We opted for 2 foot extensions on both sides of the house and across the entire back so the room sizes aren't 100% accurate, they are all a little bigger. Also have 9' ceilings on the 1st floor and the optional super bath in the master.
These pics don't look very good against the blue background so if you click and drag across the pictures, you can see the floorplans clearly.
First floor:
Second floor:
Here is the floor plan.
We opted for 2 foot extensions on both sides of the house and across the entire back so the room sizes aren't 100% accurate, they are all a little bigger. Also have 9' ceilings on the 1st floor and the optional super bath in the master.

These pics don't look very good against the blue background so if you click and drag across the pictures, you can see the floorplans clearly.
First floor:
Second floor: