Lesbian love
Re: Lesbian love
I still need to slip out of work and the red wings play at 8 tonight. Bitch needs probably 10 hours of work.
I got the bondo completely done, then installed the gas cap and realized that the lip of the tank where the gas cap goes is beaten about 1/4" down from where the cap sits.
So back to square one for the bondoing.

I need to have this bitch done -handbrake in 3 weeks.
I got the bondo completely done, then installed the gas cap and realized that the lip of the tank where the gas cap goes is beaten about 1/4" down from where the cap sits.
So back to square one for the bondoing.

I need to have this bitch done -handbrake in 3 weeks.
yeah i don't see me getting the 636 ready by then
Re: Lesbian love
The tops of my feet hurt if I wear shitty shoes and do a lot of walking on hard surfaces. I have really high arches.
Re: Lesbian love
Re: Lesbian love
ok man......whatever you gotta tell yourself.......but enough about you and your master....
Last night was great......went to the mall with my girl and had sex in a dressing room at Macy's.......then went for a few drinks and decided to find a more public place.......ended up on a pedestrian crossing bridge at a traffic light on a well traveled road!! This was probably the best public place yet!!

Last night was great......went to the mall with my girl and had sex in a dressing room at Macy's.......then went for a few drinks and decided to find a more public place.......ended up on a pedestrian crossing bridge at a traffic light on a well traveled road!! This was probably the best public place yet!!

thats really good Re: Lesbian love
I still need to slip out of work and the red wings play at 8 tonight. Bitch needs probably 10 hours of work.
I got the bondo completely done, then installed the gas cap and realized that the lip of the tank where the gas cap goes is beaten about 1/4" down from where the cap sits.
So back to square one for the bondoing.

I need to have this bitch done -handbrake in 3 weeks.
I got the bondo completely done, then installed the gas cap and realized that the lip of the tank where the gas cap goes is beaten about 1/4" down from where the cap sits.
So back to square one for the bondoing.

I need to have this bitch done -handbrake in 3 weeks.
To me, done means you can ride it
Re: Lesbian love
The bondo am going to do after work. I can get 2 applications and sanding sessions in on a weekday. What I want to get done is to get the chain cut to length, get the subframe supports clearanced so the stock undertail fits, get the new controls/switches hooked up, etc. It's mostly a one man job but whoever isn't working on **** can be drinking a beer.









